Buying off-plan: advantages and disadvantages for your mortgage

Buying off-plan: advantages and disadvantages for your mortgage

A flat for sale off-plan is advertised at CHF 800’000.–. An existing flat with similar features is listed at the same price. The developer of the first flat explains that you will save on acquisition costs, be able to choose your kitchen and benefit from the warranties that come with a new-build property.

But which of the two flats will actually cost you less? And, more importantly, do you have the necessary liquid funds to finance the one that does not yet exist?

In Switzerland, financing an off-plan purchase has a distinctive feature: you commit today to buying a home whose final value, running costs and sometimes even final cost will only become known several months later.

Buying off-plan is not simply a matter of financing a property. You also need to finance the time required to build it and manage the associated financial risks.

What you are actually buying when you purchase off-plan

Two identical flats, two different financial commitments

An off-plan sale involves marketing a home before it is completed. However, several different legal arrangements fall under this description.

When you buy a share of the land, you acquire a fraction of the plot and commission a general contractor to build your home. For a flat under condominium ownership (PPE), this fraction is generally expressed in thousandths. You become an owner at the beginning of the project, upon registration in the land register, and assume the responsibilities of the party commissioning the construction.

In a sale of a turnkey home with deferred transfer of ownership, the developer generally remains the owner during construction. You commit to buying the home, and ownership is transferred at a later date. In principle, the developer finances the works, subject to the instalments specified in the contract.

FeaturesShare of the landTurnkey sale with deferred transfer of ownership
Transfer of ownershipAt the start of the projectGenerally at handover
Construction financingMainly by the buyerMainly by the developer
Own construction loanOften necessaryGenerally unnecessary
Bank interest before handoverPossible from the purchase of the land onwardsDepends on how instalments are financed
Risk of having to find a new contractorBorne more directly by the buyerDepends on the seller’s commitments
Potential savings on property transfer taxDepends on the canton and the legal arrangementGenerally more limited

Intermediate arrangements also exist, notably purchasing the land and then paying the balance at handover. They deserve particular attention because they can reduce financing requirements during construction.

The three schedules that must be aligned

Buying property off-plan involves three independent schedules:

  • The legal schedule: reservation, signing of the notarised deed, transfer of ownership.
  • The construction schedule: building permit, construction works, payment calls, acceptance of the works.
  • The bank’s schedule: availability of equity, loan drawdowns, expiry of the bank’s financing approval and commencement of the definitive mortgage.

Suppose your contractor requires a payment of CHF 120’000.– on 15 September, but your bank makes the release of funds conditional on verification of construction progress. If this verification takes place three weeks later, you could be late in paying the contractor.

Before signing, have the payment terms of the construction contract coordinated with those of the lender. Loan approval does not mean that the amount is immediately available.

How can you buy off-plan without choosing the wrong home or contract?

Examine what the marketing illustrations do not show

Property developments can be found on property listing websites, through estate agents and directly from developers, sometimes several years before handover.

When choosing a new-build flat off-plan, request dimensioned drawings and establish precisely what floor areas are being advertised. A flat advertised as having an area of 110 m² may, for example, comprise 98 m² of internal floor area and half the area of a 24 m² terrace.

At CHF 800’000.–, the price therefore increases from CHF 7’273.– per square metre of advertised sales area to CHF 8’163.– per square metre of internal floor area. This difference may also affect the bank’s comparison with other homes.

Visit the site, look into the development potential of neighbouring plots and examine the easements, meaning the rights and restrictions affecting the property.

Also visit a building completed a few years earlier by the same contractor. The condition of the façades and communal areas, together with the owners’ experiences, will tell you more about the durability of the contractor’s buildings than a virtual tour.

From reservation to signing before the notary

Ideally, the building permit should be enforceable before you make a binding commitment. A project that is being marketed does not necessarily have permission to commence construction.

The reservation deposit requires particular attention. A simple written reservation does not replace the notarised form required for a preliminary agreement to sell real estate under Article 216 of the Swiss Code of Obligations. Nevertheless, the conditions under which the money is returned may become a matter of dispute.

Ask for the refund conditions to cover, in particular, refusal of financing, abandonment of the project and failure to obtain a building permit by a specified date. Have the possibility of depositing the money with the notary examined, rather than paying it directly to the developer.

Before signing the final agreements, examine together the deed of sale, the general contractor agreement, the building specification, the payment schedule, the plans, the deed establishing condominium ownership and the condominium regulations.

Also ask how any mortgage liens will be discharged or released if the developer has encumbered your future plot or unit with them. Your lender must be able to establish its own security with the agreed ranking.

Buying off-plan: the distinctive features of mortgage financing

The 20% equity trap

To finance the purchase of your primary residence, banks generally require equity amounting to 20% of the lending value, in other words, the value they assign to the home that will serve as security for the loan.

Since 1 January 2025, the Swiss Bankers Association’s guidelines recognised by FINMA have required, among other things, a contribution of at least 10% of this value from sources other than the second pillar (occupational pension scheme). Any difference between the acquisition cost and the bank’s valuation must also be covered without drawing on the second pillar.

Here is how two relatively commonplace events can jeopardise the financing of an off-plan purchase that was initially approved.

Financial situationInitial budgetRevised budget
Price of the homeCHF 800’000.–CHF 800’000.–
Additional construction costsCHF 0.–CHF 24’000.–
Total costCHF 800’000.–CHF 824’000.–
Value accepted by the bankCHF 800’000.–CHF 770’000.–
Mortgage at 80%CHF 640’000.–CHF 616’000.–
Equity requiredCHF 160’000.–CHF 208’000.–
Minimum contribution excluding second-pillar fundsCHF 80’000.–CHF 131’000.–

Ultimately, the home costs only CHF 24’000.– more, but the total equity requirement increases by CHF 48’000.–. The minimum contribution excluding second-pillar funds, meanwhile, increases by CHF 51’000.–.

Buying off-plan: an additional cost of CHF 24,000 may require an extra CHF 48,000 in equity.

The combined effects of additional construction costs and a reduction in lending value on mortgage financing.

The money spent on construction and the property value created are two different concepts.

A customised kitchen or high-end fittings do not necessarily result in an equivalent increase in lending value.

Ask your mortgage adviser to compare valuations from several lenders and check the financing conditions for future additional costs.

If your equity contribution includes pension assets, also check the date on which they will actually become available. Second-pillar funds earmarked for financing your primary residence do not work like a bank account that can be accessed immediately to pay any instalment.

Tip Submit an application now to receive mortgage offers that enable you to buy the property you want.

Why a cheaper construction loan can cost more

A construction loan is a credit facility drawn down progressively to pay construction invoices. Interest during construction is calculated on the amounts borrowed as the works progress.

Some banks also charge a quarterly credit commission, sometimes calculated on the highest outstanding balance during the quarter.

A commission of 0.25% per quarter amounts to the equivalent of up to 1% per year on a constant balance. An offer at an interest rate of 1.7% with this commission may therefore cost more than a loan at 2.5% with no commission.

By way of example, on a drawn amount of CHF 400’000.– over twelve months:

Annual costsBank ABank B
Borrowing interest rate1.7%2.5%
InterestCHF 6’800.–CHF 10’000.–
Quarterly commission0.25%None
Annual commissionsCHF 4’000.–CHF 0.–
Total costCHF 10’800.–CHF 10’000.–

The bank quoting the higher interest rate is the cheaper option in this case.

The consolidation terms, in other words the arrangements for converting the construction loan into a definitive mortgage, can also make a difference. Some lenders allow drawn amounts to be progressively converted into mortgage tranches.

Be careful, however, with staggered maturity dates: several fixed-rate tranches ending on different dates may make it more difficult to switch banks in the future.

Buying off-plan or buying an existing home: which actually costs less?

Let us compare two homes priced at CHF 800’000.–, financed at 80% with a definitive ten-year fixed-rate mortgage at 1.7%.

For the off-plan purchase, let us assume a share of the land costing CHF 240’000.–, an 18-month construction period, a loan at 2.5% and a quarterly commission of 0.25%. The buyer continues renting their current home for CHF 2’000.– per month until handover.

Financing costs during construction

StageCumulative paymentsOutstanding bank debtInterest for the following quarter
Purchase of the landCHF 240’000.–CHF 80’000.–CHF 500.–
Month 3CHF 360’000.–CHF 200’000.–CHF 1’250.–
Month 6CHF 480’000.–CHF 320’000.–CHF 2’000.–
Month 9CHF 640’000.–CHF 480’000.–CHF 3’000.–
Month 12CHF 720’000.–CHF 560’000.–CHF 3’500.–
Month 15CHF 780’000.–CHF 620’000.–CHF 3’875.–
Month 18: handoverCHF 800’000.–CHF 640’000.–Consolidation
Total interest during constructionCHF 14’125.–
Quarterly commissionsCHF 5’650.–
Cost of the construction loanCHF 19’775.–

The CHF 160’000.– of equity is assumed to be used in full at the time of the first payment. Interest and commissions are paid separately, without increasing the debt.

The ten-year financial comparison

Take the example of the canton of Vaud, with a customary property transfer tax rate of 3.3%, and assume that only the value of the land is taxable for the off-plan purchase. This tax assumption must be confirmed for each transaction.

CriteriaOff-plan purchaseExisting home
Purchase priceCHF 800’000.–CHF 800’000.–
EquityCHF 160’000.–CHF 160’000.–
Property transfer tax under the stated assumptionCHF 7’920.–CHF 26’400.–
Initial liquid funds required, excluding other costsCHF 167’920.–CHF 186’400.–
Time between acquisition and moving in18 monthsImmediate
Interest during constructionCHF 14’125.–CHF 0.–
Construction loan commissionsCHF 5’650.–CHF 0.–
Rent continuing during constructionCHF 36’000.–CHF 0.–
Definitive mortgageCHF 640’000.–CHF 640’000.–
Monthly interest after moving inCHF 906.67CHF 906.67
Bank interest during the first 10 years after acquisitionCHF 106’605.–CHF 108’800.–
Period of occupancy after 10 years8.5 years10 years
Total interest, commissions, rent and property transfer tax over 10 yearsCHF 156’175.–CHF 135’200.–
Total of these same costs for 10 full years of occupancyCHF 172’495.–CHF 135’200.–

Despite a tax saving of CHF 18’480.–, the off-plan purchase results in CHF 20’975.– in additional expenditure on the costs compared over the first ten years. For an identical period of occupancy, the difference reaches CHF 37’295.–, without discounting the cash flows.

Buying off-plan: breakdown of additional costs over 10 years

Impact of interest during construction, bank commissions, rent and property transfer tax savings on the actual cost of buying off-plan.

At what level of rent does the tax advantage disappear? In our example, over the same ten-year period from acquisition, the threshold is approximately CHF 835.– in monthly rent during construction.

This calculation takes into account the mortgage interest that would have been paid during those 18 months had the existing home been purchased immediately.

However, it does not take into account the potential maintenance or energy savings resulting from the new-build home, nor the different changes in value of the two properties.

The simulations deliberately exclude amortisation to isolate the financing costs. In practice, banking guidelines require the debt to be reduced to two-thirds of the lending value within a maximum of fifteen years. Direct amortisation must commence no later than the regulatory deadline following completion of the works, within a maximum of twelve months.

Buying off-plan: the advantages and risks the price does not reveal

A lump-sum price is not necessarily a final price

Buying a house off-plan offers the benefits of a new-build home, potentially better energy performance and a degree of freedom in customising it. But this freedom must be subject to financial limits.

The lump-sum price under the construction contract covers the agreed works and services. It does not mean that everything you will need in order to live in the property is included.

In particular, check utility connections, potential geological difficulties, external works, electrical fittings, buyer-requested alterations and price adjustment clauses.

For the finishes, ask whether the budgets include only the supply of materials or their installation as well. A tiling allowance of CHF 50.–/m² does not establish the final cost of the covering unless you know the installation costs.

Also check how credits for omitted or downgraded work are calculated. Giving up an item worth CHF 5’000.– does not necessarily mean your bill will decrease by CHF 5’000.–.

Insist on a written costing of alterations before they are carried out, including fees, VAT and the impact on the handover date.

Receive 3 free mortgage loan proposals

Quick and no-obligation request

How bankruptcy can turn your mortgage into an unfinished building project

You have paid CHF 400’000.– under a construction contract worth CHF 560’000.–. You therefore have CHF 160’000.– left to pay.

The general contractor goes bankrupt. A new contractor agrees to complete the works for CHF 230’000.–, particularly because of the costs of taking over the project, technical checks and additional responsibilities.

Your financing requirement increases by CHF 70’000.–, without the value of the completed home necessarily increasing.

The bank’s monitoring of payments does not constitute a completion guarantee. Ask who will bear this difference and examine the guarantees offered: the amount covered, beneficiary, duration and conditions under which payment can be claimed.

A second risk is the statutory lien of tradespeople and contractors under Swiss law. An unpaid subcontractor may obtain registration of a lien over your property, even if you have already paid the general contractor. You could therefore face the risk of paying twice.

The lien must be registered no later than four months after completion of the works concerned (Article 839 of the Swiss Civil Code). The final payment to the contractor and the expiry of this period do not therefore necessarily coincide.

On 13 August 2025, the Federal Council decided against a general overhaul of this mechanism. Since 1 January 2026, however, a rule limiting coverage of default interest to ten years applies to the provision of sufficient security to prevent registration of the lien.

Examine the specific guarantees with your notary, the possibilities for direct payment to tradespeople and the supporting documents to obtain before each release of funds.

The expenses and responsibilities of a condominium owners’ association that does not yet exist

When buying an existing flat, you can review the accounts of the condominium owners’ association. With an off-plan purchase, the advertised communal charges are generally based on estimates.

Request the projected budget, the rules governing the allocation of costs, the maintenance contracts and the arrangements for contributions to the renovation fund.

Also check whether communal installations will actually belong to the condominium owners’ association. A heating system or photovoltaic panels operated by an external provider may create long-term financial commitments.

At handover, distinguish between acceptance of your own flat and acceptance of the communal areas, particularly the roof, technical installations and garages.

The revision of Swiss law governing construction defects, adopted on 20 December 2024 and in force since 1 January 2026, strengthens buyers’ contractual protection. For the new contracts concerned, it provides, in particular, for a defect notification period of at least 60 days and protects the right to have defects rectified.

The five-year limitation period must not be confused with the notification period. Do not delay reporting a defect.

Have any unfinished work recorded in the handover report, including external works postponed for seasonal reasons. Negotiate beforehand the terms of any retention of funds until such works are completed.

Frequently asked questions about buying property off-plan

How much does a six-month handover delay cost?

With an outstanding loan balance of CHF 620’000.–, a construction loan interest rate of 2.5%, a quarterly commission of 0.25% and monthly rent of CHF 2’000.–, the delay results in additional expenditure of CHF 22’850.–, before any compensation.

Can you lock in your mortgage rate before construction?

Some lenders offer to fix a rate for a future date. This option may involve a surcharge and penalties if the funds are not drawn on the agreed date. Make sure the terms take account of a possible construction delay.

Can you resell a flat bought off-plan before handover?

Depending on the legal arrangement, you will either need to resell a property you already own or assign your contractual right to acquire the home. The developer’s consent may be required. Tax costs, compensation payable to banks and contractual restrictions can affect the outcome of this transaction.

Is financing an off-plan flat intended for letting different?

Yes. Lenders may require more equity and assess the project’s rental profitability. Second-pillar assets cannot be withdrawn to finance a pure rental investment. A handover delay also represents a potential loss of income.

When should you contact a mortgage adviser to finance an off-plan purchase?

Ideally before making a reservation. Your adviser can compare bank valuations, examine the financing of the various stages and seek a mortgage solution that takes into account construction costs, additional costs and timescales.

Arrange financing for your property project, not just its purchase price

The best financing for an off-plan purchase is not necessarily the financing offered by the developer’s bank, nor the option with the lowest mortgage interest rate.

It must match your available financial resources, the contractual schedule, the characteristics of the construction project and your circumstances after moving in.

Tip Try our mortgage calculator to find out what your monthly payment could be.

Comparing several lenders makes it possible to examine all these factors before you commit to an arrangement that is difficult to change.

Are you considering buying a flat or house off-plan in Switzerland? Contact our mortgage financing specialists to obtain a personalised assessment of your project and find financing conditions suited to your purchase.

A developer can guarantee you a construction price. Your objective must be to control the cost of your entire property project. These are not the same thing.

Calculate the cost of waiting for your new home

How much does waiting for your new home cost?

Compare buying off-plan with buying an existing property over ten years from acquisition.

Enable JavaScript to change the simulation.

Simulation assumptions
CHF 800’000.–
20%
18 months
0 months
2.5%
58.85%
0.25%
1.7%
CHF 2’000.–

Transfer tax assumptions

30%
3.3%
This illustrative assumption must be confirmed with your notary depending on the canton and contract structure. Untick this option if the full price is taxable or if you prefer not to assume a saving. The same rate applies to both purchases; exemptions and special tax scales are not modelled.
Land value
CHF 240’000.–
Construction value
CHF 560’000.–
Transfer tax – existing property
CHF 26’400.–
Transfer tax – off-plan purchase
CHF 7’920.–
CHF 18’480.– Automatically calculated estimate.

Your financing

Equity
CHF 160’000.–
Final mortgage
CHF 640’000.–

Costs before moving in

Estimated construction interest
CHF 14’125.–
Estimated commissions
CHF 5’650.–
Rent paid (including delay)
CHF 36’000.–
Interest and commissions during delay
CHF 0.–
Total waiting costs
CHF 55’775.–

Comparison with an existing property

Potential transfer tax saving
− CHF 18’480.–
Mortgage interest avoided while waiting
− CHF 16’320.–
Extra cost of buying off-plan over ten years (items compared)
CHF 20’975.–
Break-even monthly rent: CHF 835.–

Monthly mortgage interest after handover: CHF 906.67.

Illustrative simulation without amortisation. Commissions are estimated on the average drawn balance, prorated by time. During a delay the credit is assumed fully drawn. Notary fees, ownership costs, energy, annual taxes, changes in value and discounting are excluded. Debt and rates remain constant after handover. Actual terms depend on the lender and contract. This is neither a credit offer nor confirmation of affordability.

Have the financing of your property project assessed

Sources:
Federal Office of Justice – Liability for construction defects and the statutory lien of tradespeople and contractors.
Swiss Bankers Association – Guidelines on minimum requirements for mortgage financing, applicable since 1 January 2025.
Cantonal Tax Administration of the canton of Vaud – Property transfer tax, taxable base and tax rates.

The financial examples presented in this article are illustrative and do not constitute financing offers. Rates, commissions, property valuations, contractual provisions and tax consequences vary according to the institutions, projects and cantons concerned. Contracts and guarantees must be reviewed individually with the appropriate professionals.